Web Content Viewer
ActionsProcessed trucks (02.06.2020)
In respect to the increasing volume of trucks, crossing the major BCPs of the Republic of Bulgaria, and in view of assisting the analytical business needs of the carriers, the National Customs Agency publishes a daily report on the trucks processed during the past 24 hours.
Processed trucks
from 8.00 АМ on 01.06.2020 to 8.00 АМ on 02.06.2020
BCP |
total |
Including |
|
Incoming |
Outgoing |
||
Kapitan Andreevo |
1963 |
1003 |
960 |
Lesovo |
536 |
297 |
239 |
Kalotina |
887 |
423 |
464 |
Kulata |
1784 |
726 |
1058 |
Danube Bridge - Rousse |
2044 |
718 |
1326 |
Danube Bridge - Vidin |
383 |
168 |
215 |
*The report includes only the major BCPs
*The report indicates processed trucks with three or more axles, two-axle trucks and trucks up to 3.5 tonnes, passed through the control of road charges and permits on the BCP.
In respect to the repair at Kulata BCP, a reorganization of the truck movement is possible. The lanes and the balance devices are repaired gradually and two lanes each for every direction for truck processing are ensured.
In respect to the repair at Kalotina BCP, a reorganization of the truck movement is possible. The number of trucks that can stay on the territory of the point is limited. The construction work shall not have an impact on the throughput of the checkpoint for cars and trucks.